Industrial Uniform Service, GW Treatment System

Description

Dynamic groundwater recirculation remedial system. Horizontal directional drilling to install conveyance pipe and electrical conduits in public right of way. Precast extraction and injection well installation and fabrication of well heads. Setting all down well pumps and equipment. Constructing concrete containment pad with curb and sump. Offloading and setting equipment, vessels and tanks. Install electrical panels and all instruments and controls.  

 

ProjectDynamic Groundwater Treatment and Re-injection System
ClientIndustrial Laundry & Uniform Service – Long Beach, CA