VANDENBERG AFB, TO-10 & 11

Significant features

· 2,500’ of underground trenching and installation of HDPE and PVC conveyance pipe

· 1.2 miles of horizontal boring and installation of double contained HDPE pipe for a 140 gpm  treated water discharge line

· 3’ x 5’ ground water extraction well vaults with construction of stainless steel well head and down well components

· 40’ x 60’ equipment compound construction with 12” high containment curb and various equipment and tank pads

· Installation and seismic anchoring of remediation equipment including 12,000 lb carbon skid, 18,000 gallon bio-reactor tank, poly tanks and pump system

· Control room construction consisting of 120 sq ft engineered, pre-fabricated steel building

ProjectGroundwater bio-remediation system construction
SiteFormer electrical manufacturing facility, Hollister, California
Value$ 1,355,000